Showroom AI (demo)
Prepared for Trattoria del Porto

Proposal

Trattoria del Porto — Option B

Example project

Your space todayYour space today
Proposed fit-outProposed fit-out

Concept visualisation — product appearance and scale may vary from the delivered goods.

The complete specification shown in the visual, delivered and installed by our own team.

  • Everything in the render, nothing invented
  • Delivery and installation included
  • 5% package discount

What's included

6-Burner Gas Range

1 units · lead time 4–6 weeks

€4,280

Twin-Basket Fryer

1 units · lead time 2–3 weeks

€2,150

Flat Top Griddle

1 units · lead time 2–3 weeks

€1,840

Central Island Prep Bench

1 units · lead time 4–6 weeks

€1,490

Wall Prep Table 1800

2 units · lead time 2–3 weeks

€1,440

Pass-Through Dishwasher

1 units · lead time 2–3 weeks

€5,600

Double-Bowl Wash Sink

1 units · lead time 4–6 weeks

€980

Upright Refrigerator 700L

1 units · lead time 2–3 weeks

€3,150

Overhead Pot Shelf

1 units · lead time 2–3 weeks

€340